New Care Facility

Client:
The Masonic Villages Trust
Location:
Lower Hutt, Wellington
Date:
2019 - 2022

The Masonic Villages Trust wanted to greatly expand andmodernise the Care Facility at their Woburn Village.  The new Care Facility was to be a combinationof upgraded and re-purposed existing buildings and new construction.  A major constraint was the requirement thatthe remainder of the village remained open throughout and that disruption tothe residents was minimised.

 For the new two-storey portion we designed an Armadillo foundation.  The existing portions to be re-used were constructed with conventional timber floors on piles.  These required upgrading to meet current codes and Importance Level 3 requirements.

 As well as design, Miyamoto monitored the construction.  Whilst the new portions were relatively straightforward, many details of the existing structure differed from the construction drawings which resulted in many last-minute changes to keep the contractor on track and the resulting building fully compliant.

 The new Care Facility opened in early 2023.

Services provided:

Building Rehabilitation
Structural Design
Structural analysis
Construction Monitoring

Want To Discuss About Your Next Project?